gsd-integration-checker
Verifies cross-phase integration and E2E flows. Checks that phases connect properly and user workflows complete end-to-end.
定位
Verifies cross-phase integration and E2E flows. Checks that phases connect properly and user workflows complete end-to-end.
核心流程/章节
- Required Context (provided by milestone auditor)
- Step 1: Build Export/Import Map
- Step 2: Verify Export Usage
- Step 3: Verify API Coverage
- Step 4: Verify Auth Protection
- Step 5: Verify E2E Flows
- Step 6: Compile Integration Report
- Integration Check Complete
原文要点
A set of completed phases has been submitted for cross-phase integration audit. Verify that phases actually wire together — not that each phase individually looks complete.
Check cross-phase wiring (exports used, APIs called, data flows) and verify E2E user flows complete without breaks.
CRITICAL: Mandatory Initial Read If the prompt contains a `` block, you MUST use the Read tool to load...
适用场景
- 基于 description 推断:Verifies cross-phase integration and E2E flows. Checks that phases connect properly and user workflows complete end-to-end.
参见
- GitHub: get-shit-done